Eliminate timers, voltage sensitive relays,
and contactors!
TYPICAL INSTALLATION:
- Select electrical enclosure to house Torq
kit plus any terminal strip you desire. Allow for electrical
clearances to meet applicable codes. Cut hole in back of
enclosure to let phase converter shaft pass through enclosure.
- Mount enclosure to end bell, using stand
offs if end bell doesn't doesn't have a flat enough face.
Stand off tubing can be purchased from McMaster-Carr (708)
833-0300.
- Mount stationary switch inside enclosure on the
back surface. Allow for electrical clearances to meet applicable
codes. Connect wiring to switch.
- Mount centrifugal mechanism on the shaft.
Slip on centrifugal mechanism so that RUNNING CLEARANCE between
switch arm/buttons is in accordance with the instructive
notes. Tighten two set screws.

This electro-mechanical method eliminates
the effect of line voltage variations and the complaints and
warranty call backs which can occur. Use this reliable, trouble-free
approach and order from the phase
converter kit chart. If
you have any questions, call us for technical support
at (440) 232-4100 or contact us by email. Our specialized
knowledge of rotational speed sensing technology is always
available to you.